Leave a Message

Thank you for your message. We will be in touch with you shortly.

Downtown Celina's $15 Million Project Almost Stalled Over 18 Parking Spaces

Downtown Celina's $15 Million Project Almost Stalled Over 18 Parking Spaces

Read the press release and Trackside Junction sounds like the easiest yes the Celina City Council has cast in years. A $15 million private investment. A historic square finally connected to the city's growing Entertainment District. Nack Development, the same firm behind Frisco's Rail District and Old Town Lewisville, putting its name on the project. Mayor Ryan Tubbs calling downtown "where our story began."

None of that explains why the vote was 5-2.

If you live near the Square, you already know something is different this year. What most residents don't know is that two council members looked at this deal and said no, and their objection had nothing to do with the size of the investment, the developer's track record, or whether Celina needs more restaurants downtown. It came down to a single parking lot.

What the council actually argued about

At the July 14 meeting, council members Shea Scott and Shane Lambert voted against the economic development agreement for Trackside Junction. Both said afterward they support the project itself. Their objection was narrower: the deal requires the city to lease a parcel at 202 N. Louisiana Drive so Nack Development can build an 18-space public parking lot on it, and neither council member felt that piece had gotten enough discussion before the vote. Lambert asked for a more thorough conversation on the parking arrangement. Scott put it plainly, saying he had a problem with one part of an otherwise good project that still needed to be worked out.

That is a strange thing to nearly derail a $15 million downtown investment over, and that's exactly why it matters. It tells you the council isn't rubber-stamping growth. Even a project everyone publicly likes still gets picked apart over how a specific eighteen-car lot gets financed and who controls it. If you're watching how Celina handles the next round of downtown proposals, this is the level of detail that actually decides them.

The money behind the yes votes

The five council members who approved the deal signed off on more than a handshake. The city's incentive package for Nack Development totals roughly $3.05 million, broken into three distinct pieces.

Source Contribution
City of Celina Sells the land at 111 W. Pecan St. (appraised near $1 million) to Nack for $1
TIRZ No. 11 $1.7 million grant
Celina EDC $350,000 grant

The TIRZ piece is the one worth sitting with. Tax Increment Reinvestment Zone No. 11 was created back in 2017 specifically to fund downtown improvements, but Trackside Junction is the first major development to actually draw on it. Seven years after the city set the mechanism up, this is the project putting it to work, funded by the added property tax revenue that new downtown growth is expected to generate rather than by a new tax on residents. If Nack Development misses its construction milestones, ownership of the land reverts back to the city, so Celina isn't just handing over a discounted parcel and hoping for the best.

Two buildings, and only one number that made the headlines

Every article about Trackside Junction repeats the same figure: 15,000 square feet of new commercial space. What gets left out is that the project itself is nearly four times that size.

Trackside Junction is actually two buildings totaling around 55,000 square feet. The first is a four-story structure with 10,000 square feet of retail and restaurant space on the ground floor and three floors of office space stacked above it. The second building adds another 15,000 square feet, split between 5,000 square feet of ground-floor retail and restaurant space and five residential units on the floors above.

Add the ground-floor retail in both buildings together, 10,000 plus 5,000, and you get the 15,000 square feet everyone keeps quoting. That's the number the Celina Economic Development Corporation's executive director, Anthony Satarino, used when he told council the project would grow downtown's total commercial square footage by 20 percent. It's a real number, but it only counts the storefronts. The three floors of office space and the five condos above them aren't part of that math at all. If you've been picturing Trackside Junction as one new restaurant row, it's closer to an entire small mixed-use block, with people living and working above the shops from day one.

Nack Development is required to break ground by the start of 2027 and finish both buildings by mid-2028, and part of the agreement includes a flashing crosswalk across Louisiana Drive at Pecan Street, pending approval from the Texas Department of Transportation, to help people actually walk between the new block and the existing Square.

The Square is already changing, before a single shovel moves

Here's the part a resident would notice before any of the financing details matter. The old Jimbo's Pizza space at 501 W. Walnut is becoming Nowhere Bar, a project from Taylor Witt and Katie Dunn, who also own the Little Wooden Penguin. The concept is a dive bar built for burgers, beer, sports on the TV, and shuffleboard, and the patio out front is being redone at the same time.

That's a meaningful shift for a block that has historically gone quiet early on weeknights. A shuffleboard bar with a rebuilt patio changes what a Tuesday night on the Square can look like, and it's happening now, years ahead of Trackside Junction's mid-2028 completion date. If you've assumed nothing changes downtown until the new buildings open, the storefronts are already proving otherwise.

What lands on the same calendar this fall

None of this construction and financing conversation is happening in a vacuum. The Square still runs its own weekly and seasonal rhythm, and this fall stacks several of the bigger dates close together.

  • The monthly Friday Night Market returns to Downtown Celina on the first Friday of the month, running 6 to 9 p.m. with local vendors, food, and live music.
  • Oktoberfest takes over the Square on October 3, complete with an official keg tapping and the Dachshund Derby, which reliably pulls in people who otherwise skip festivals entirely.
  • Beware! of the Square follows on October 24. Celina bills itself as the Halloween Capital of North Texas, and the event draws costumed crowds for trick-or-treating and themed activities right on the historic square.

"Great downtowns don't happen overnight," said Clint Bissett, president of the Celina Economic Development Corporation Board of Directors, in the city's July 14 announcement. "They grow through intentionality, partnerships, long-term thinking, and investments that create lasting value."

Bissett's comment reads like standard groundbreaking language until you line it up against the actual sequence here. Seven years between creating TIRZ No. 11 and putting it to use. A year of negotiation between the city, the EDC, and Nack Development before the July vote. A council that still argued over one 18-space parking lot even after all that groundwork. Intentionality, in this case, isn't a marketing word. It's a documented, occasionally contentious process that residents can trace meeting by meeting if they want to.

What this actually means if you live near the Square

The practical takeaway for anyone downtown this fall isn't that a shiny new development is coming. It's that the Square you already know is entering a multi-year stretch where an active construction site, a rebuilt bar patio, TIRZ-funded infrastructure, and the same festivals you've attended for years are all going to overlap on the same handful of blocks. Parking, in particular, is worth watching, since the very dispute that split the council vote centers on exactly the kind of lot that gets tight during Oktoberfest or the Friday Night Market.

Celina's downtown has changed shape before, most visibly around its centennial in 2011 when the current gazebo and much of the Square's present layout came together. Trackside Junction is the next version of that same pattern, financed differently and negotiated more carefully than most residents realize.

If you're weighing what a home near Downtown Celina is actually worth holding onto through a construction cycle like this, or you're curious how a project like Trackside Junction tends to move property values in the surrounding blocks, the team at Monument Realty TX knows this market block by block. Contact us when you're ready to talk specifics.

Join

We would love to get to know more about you and your real estate needs, so we can better understand your goals and how we can support you every step of the way in your journey.

Follow Us on Instagram